PDG has worked on a wide range of mining, petrochemical, commercial, industrial and building projects. Some examples of these projects are provided below;
WAITSIA PROJECT
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites
Project Work Volume: 600 tons of structural steel and platewwork. Major Assignment: Shop detailing services for structural, platewwork & miscellaneous steelwork for the Gas Processing modules for the Waitsia Gas Project Stage 2 Project.
PADDINGTON GOLD PROJECT
35km north of Kalgoorlie, remains the central hub for Norton’s gold processing operations in the Goldfields region.
Shop detailing services for plateworks, which consist of 14 various lined chutes & miscellaneous steelwork for the Paddington Gold Project.
WEST ANGELAS DEPOSITS C & D PROJECT
Shop detailing services for piping, platework & miscellaneous steelwork for the Primary and Secondary Crushing facilities, Conveyors, Transfer Station, Surge Bin facility and Low-level & Mid-level Conveyor modules for the Rio Tinto West Angelas Deposit C & D Project.
METRONET FORRESTFIELD AIRPORT LINK
1200t of Structural steel shop detailing for the Forrestfield Airport Link project. The scope included the new Forestfield, Redcliffe and Airport Central train stations along with three Emergency Egress Shafts and Dive Portal buildings along the train route.
BHP POWDER LEACH PROJECT
Shop detailing of 11 Nickel Sulphate Tanks
WOODSIDE PLUTO DFS PROJECT
Pipe support structural steel shop detailing
YANDI 1 TRIPPER DISCHARGE CHUTE DETAILING
Tripper Discharge Chute detailing
TIANQI LITHIUM PROJECT
Shop detailing of 33 Stainless and 53 Carbon steel Tanks
TIANQI LITHIUM PROJECT
3D piping modeling and shop detailing of 1,400 isometrics
SUNRISE DAM POWER STATION
Structural steel shop detailing
Structural steel shop detailing
BIBBULUMN TRACK BRIDGE
Structural steel shop detailing
METH CARE AGED CENTRE
90T Structural steel shop detailing
BELMONT FORUM SHOPPING CENTRE EXTENSION
180T of Structural steel shop detailing
JUNDEE EXPANSION PROJECT
Structural steel shop detailing for Chutes
Structural steel shop detailing
PERTH MINT ASSAY LAB
Structural steel shop detailing
BHPB MAC WORKSHOP EXTENSION
Structural steel and piping isometric shop detailing
CHALLENGER TAFE – STAGE 2
Structural steel shop detailing
ROY HILL PROJECT
Produced structural steel shop drawings for more than 1000T of steel for the Roy Hill project.
Produced structural steel shop drawings for more than 1000T of steel for the Roy Hill project.
THE WIGGINS ISLAND COAL EXPORT TERMINAL (WICET)
Project work volume: More than 3000 Tons.
Major Assignment:
- Carried out lift studies and transport analysis to determine lifting and sea fastening requirements for 550T surge bin
- Designed lashing plan for the Galleries and all packaged steel.
Performed lift studies and transport analysis to determine lifting and seafastening requirements for 550T surge bin
AN3 PROJECT – NAAN3
Produced structural steel shop drawings for more than 700T of steel for the AN3 project.
Produced structural steel shop drawings for more than 700T of steel for the AN3 project.
DEVIL CREEK ONSHORE DEVELOPMENT PROJECT
Project Work Volume: 3,000 tons of structural steel (52 modules).
Major Assignment: Producing Piping and structural steel shop drawings for 24 modules having a total 1,400 tons of structural steel.
Structural and piping shop drawings for 24 modules having a total weight of 1400t of structural steel
ALCAN GOVE THIRD STAGE EXPANSION – G3 PROJECT
ALCAN GOVE THIRD STAGE EXPANSION – G3 PROJECT
Project Work Volume: 22,000 tons of structural steel, 1,500,000 DBI of Piping.
Major Assignment: Producing more than 6,000 piping isometric drawings and 12,000 tons structural steel shop drawings including some tanks and material handling components.
Northern Territory, Australia
Structural steel, tanks & material handling detailing. Piping isometric drawings