PDG has worked on a wide range of mining, petrochemical, commercial, industrial and building projects. Some examples of these projects are provided below;
WAITSIA PROJECT
PADDINGTON GOLD PROJECT
WEST ANGELAS DEPOSITS C & D PROJECT
METRONET FORRESTFIELD AIRPORT LINK
BHP POWDER LEACH PROJECT
WOODSIDE PLUTO DFS PROJECT
YANDI 1 TRIPPER DISCHARGE CHUTE DETAILING
TIANQI LITHIUM PROJECT
TIANQI LITHIUM PROJECT
SUNRISE DAM POWER STATION
BIBBULUMN TRACK BRIDGE
METH CARE AGED CENTRE
BELMONT FORUM SHOPPING CENTRE EXTENSION
JUNDEE EXPANSION PROJECT
PERTH MINT ASSAY LAB
BHPB MAC WORKSHOP EXTENSION
CHALLENGER TAFE – STAGE 2
ROY HILL PROJECT
Produced structural steel shop drawings for more than 1000T of steel for the Roy Hill project.
THE WIGGINS ISLAND COAL EXPORT TERMINAL (WICET)
Project work volume: More than 3000 Tons.
Major Assignment:
- Carried out lift studies and transport analysis to determine lifting and sea fastening requirements for 550T surge bin
- Designed lashing plan for the Galleries and all packaged steel.
AN3 PROJECT – NAAN3
Produced structural steel shop drawings for more than 700T of steel for the AN3 project.
DEVIL CREEK ONSHORE DEVELOPMENT PROJECT
Project Work Volume: 3,000 tons of structural steel (52 modules).
Major Assignment: Producing Piping and structural steel shop drawings for 24 modules having a total 1,400 tons of structural steel.
ALCAN GOVE THIRD STAGE EXPANSION – G3 PROJECT
ALCAN GOVE THIRD STAGE EXPANSION – G3 PROJECT
Project Work Volume: 22,000 tons of structural steel, 1,500,000 DBI of Piping.
Major Assignment: Producing more than 6,000 piping isometric drawings and 12,000 tons structural steel shop drawings including some tanks and material handling components.